05.01.10 – 2000 – Log – Elbert
There is another bug problem at the prison. This time it is a swarm that has landed on the main habitation and won’t leave. Kate has set a mobile fabricator up to add flexible screening to the dome. The plan is to move people in to disperse the bugs and if that isn’t totally effective we will make it rain. Jackson and Tyler have fabricated the weather device that will be needed. After the bugs are cleared out or mostly cleared out the screening device will be activated and moved in to place on the dome.
05.01.14 – 2111 – Log – Maci
Kate, Jackson and Tyler were up to something at the prison again. They got questioned at the meeting and finally fessed up. The group was shocked to say the least. Who would have thought that something like that was possible? If they didn’t have video of it we wouldn’t have believed them. The world does seem to want them gone.
Kate was almost to the point of moving back into the RV and parking closer to the prison. We are considering making a post out there and assigning people shifts.
05.01.18 – 1815 – Log – Jackson
Kate is brilliant. She proposed an activities building and she wants to put it close to the prison. The vote for it was unanimous. She has started the fabrication. The style will match the prison. To start there will be a trampoline room, a gymnasium for tumbling, weights and cardio, and climbing walls. After that a nap room, a gathering/eating area and a children’s play area loaded with toys, ball pits, swings, climbing and slides will be connected through an enclosed walk way. The next build will have a dance studio, an arcade, and a skate park also connecting with the walkway. The last build will have showers, a pool, a hot tub, a sauna, and then a track will be run through the whole building. We can add on to it as needed and there is already a road going straight to it. We may need to start constructing family vehicles that have roofs, this place will be great for rainy days.
